Enhanced Mobility
Swift Disassembly & Assembly
Convenient Shipping
Low Construction Costs
Integrated design for compact structures of the whole plant, and integration of all the production function units on the trailer structure, One trail and go
Only 1 crane for the initial installation, only 5 days for the first assembly; No dismantling required for relocating, resulting in a mere 1-day installation period
Only 2 high-cube containers needed for shipping of the main plant, 50% less than stationary mixing plants, convenient and cost-effective
60% less land area than stationary mixing plants, reducing land costs
The equipment can be directly installed on hardened ground without additional independent foundations, further reducing foundation construction costs
| Theoretical Rated Output | 86m³/h |
| length×width×height | 29×7×17m |
| Container quantity of main building | 2pcs |
| Container quantity of screw, silo & silo accessory | 2.5pcs |
| Total Power | 135kW |
| Discharge Height | 4m |
| Main Mixer Nominal volume | 2m³ |
| Main Mixer Dry components capacity | 3m³ |
| Theoretical Rated Output | 86m³/h |
| length×width×height | 29×7×17m |
| Container quantity of main building | 2pcs |
| Container quantity of screw, silo & silo accessory | 2.5pcs |
| Total Power | 135kW |
| Discharge Height | 4m |
| Main Mixer Nominal volume | 2m³ |
| Main Mixer Dry components capacity | 3m³ |