Wind turbine tower cranes are about to become the main force in the new plan of wind power hoisting field. Larger tonnage crawler crane or split hoisting methods can be used to solve the problems of height and weight, but these two solutions will prolong the construction period of fan hoisting and greatly increase the construction cost. While the wind turbine tower crane has stronger hoisting capacity, higher working height, lower earth bearing force, higher anti-wind ability, smaller working space and faster operation speed.
lExcellent performance, higher FSH and larger hoisting capacity
lOccupies less construction site,
reducing the area of land requisition,
free of aerial jib connection
lStrong wind resistance, high safety level
lWorry-free transportation, fewer required vehicles
lFaster installation and transferring,
more suitable for mountain and lake areas
lLow ground endurance requirement, strong adaptability to working conditions